Wow, it's been over a month since I posted an update on our downstairs bathroom renovation, other than asking for opinions on our floor grout color (thanks for the feedback, by the way!).
Day to day, I feel like we're moving so slowly on this project and I should work harder so I have more to update on, but then I remember that oh yeah, I've got a very busy job and life outside of what I share on this little blog and it's silly to feel pressure because of it. It's not like I bother with advertising, I mostly just write here because I like to share, in case there's anyone else out there going through similar projects, in hopes that something I link to or give a tip on might be useful. And also for my family to see what I'm up to, since they live far away and I don't do Facebook. So I've completely let go of any self-inflicted pressure and our timeline on this project. I shouldn't have been so ambitious anyway, considering we've never gutted an entire room before. I blame HGTV, and bloggers, who I love reading, but who's full time job is working on their house for putting an unrealistic timeline in my head. We'll finish when we finish, and it is what it is. I'm eager to be done though, can you tell? :) But we're making progress, and are definitely coming up on the home stretch.
So, with our timeline out the window, here's what we've accomplished in the past month on the weekends and some evenings after work. But first, a quick look back at how far we've come.
The above "progress" photo is where I left you last time, about halfway through installing the tile in the shower surround.
I'm happy to report that since then we've completely finished the tile. And tiling did get easier, the more I did it. It's still hard, and nerve wrecking to be working with the thinset dry times, but I definitely felt a lot more confident as I worked my way up the wall.